інші переклади
опалубка |
timbering
casing
decking
form
falsework
deck
|
подмости |
scaffold
stage
falsework
trestle
staging
trestlework
|
леса |
forestry
scaffold
line
staging
falsework
fishing line
|
приклади
Each trichord was erected in 90-ft lengths assembly-line fashion, one at a time, onto three falsework towers shored off the mechanical level framing.
Primary steel was erected on 360 tons of falsework and in a certain order because of construction loading constraints and cantilevers.
At each end of the project, the deck design and layout are irregular, and for these areas a conventional falsework arrangement was used.
These segments were supported by steel truss girders on falsework .
When the eastern-most center element was erected and detailed, crews removed truss falsework .
Other