“FALSEWORK” на російській мові

EN
RU
loading
Ad

інші переклади

іменник
опалубка
timbering casing decking form falsework deck
подмости
scaffold stage falsework trestle staging trestlework
леса
forestry scaffold line staging falsework fishing line

приклади

Each trichord was erected in 90-ft lengths assembly-line fashion, one at a time, onto three falsework towers shored off the mechanical level framing.

Primary steel was erected on 360 tons of falsework and in a certain order because of construction loading constraints and cantilevers.

At each end of the project, the deck design and layout are irregular, and for these areas a conventional falsework arrangement was used.

These segments were supported by steel truss girders on falsework .

When the eastern-most center element was erected and detailed, crews removed truss falsework .